Scope of Work
We are experts in a wide variety of jobs including:
|
||
|
||
|
||
TBS: Temporary builders supply, 1Ø or 3Ø, hire or sale, underground or overhead, Workcover compliance, portable or fixed distribution boards for large job sites |
||
|
||
|
||
|
Download our 2009 scope of work brochure here
For full descriptions of our capabilities and services please read on
Level 2 Services
Disconnections (100-400A)
Permanent disconnection & metering removal due todemolition.
Aerial Mains (new or upgrade)
Overhead service mains single or 3 phase up to 20meter run including material & a meter (E1 or E2 or E3)
conditions apply, as well as disconnection of old mains off
the same pole.
Underground Mains (new or upgrade)
3 phase underground cabling of
4c*16mm² XLPE &
piping up to 15 meter run from network pillar box to MSB,
terminate both ends, including material & a
meter (E1 or
E2 or E3).
Underground/Overhead (UGOH - 3 phase only)
Cabling (4c*16mm2XLPE) & piping up to 20m, terminateat both ends, hard covers, a meter (E1 or E2 or E3) full
energisation up to main switch & certification
Full Range of Services
Civil Work
Road & footpath opening, Road under-boring, Trenching, Concrete cutting & replacement, Rock core-holingAerial Consumer Mains
1Ø or 3Ø with protective fuses at point of attachment
Metering
1Ø or 3Ø, off peak 1 or 2, new or existing installations, Separation & Amalgamation of customers in commercial entity and complete Energization.
Admin Work through Utility Offices
Obtaining job numbers, Load approvals & follow ups, Inspection & CT metering arrangements
Kiosk
Integral Energy regions only, connection of direct feeder from sub station up to 400A
Point of Attachment
Riser brackets (rafter or facia), Posts (timber or metal), 100A-400A
Street Lighting
- Utilising cherry picker
- Highway & Street Lighting
- Car parks, School Yards & Sport Oval Lighting
- New Installations
- Maintenance